Salt Lake Express
Service Alerts
Construction, detours, stop changes, and weather that may affect your trip. Alerts with a location are pinned on the map.
Last updated September 1 at 8:36 AM MT · monitored around the clock from state DOT feeds and Salt Lake Express dispatch
- WarningconstructionIdahoUpdated August 31, 2026
I-15 roadwork
September 1, 2026 – September 1, 2026
Major Workers on roadway on I-15 Southbound from Bannock Oneida County Line to Bannock Oneida County Line. 9/1/2026 6:00 AM MT to 9/1/2026 4:30 PM MT Tue: Active all day Location: I-15, South.
- WarningconstructionIdahoUpdated September 1, 2026
I-15 roadwork
September 1, 2026 – September 3, 2026
Major Brush control on I-15 Both Directions from Bannock Oneida County Line to E Highway 30. 9/1/2026 6:00 AM MT to 9/3/2026 4:30 PM MT Tue, Wed, Thu: Active all day Location: I-15, Both.
- WarningclosureNevadaUpdated September 1, 2026
I-15 Northbound full closure
Since September 1, 2026
Crash on ramp from I-15 Northbound to N Martin L King Blvd. All lanes blocked - use other routes. Start time: 9/1/2026 7:30 AM. Location: I-15 Northbound. Lanes affected: All lanes blocked - use other routes.
- WarningclosureIdahoUpdated August 26, 2026
US-20 full closure
Since August 4, 2026
Closure on US-20 from US-20 (MM 22) to Farmway Rd. All lanes closed. Activities: Consider Alternative Route. Location: US-20. Lanes affected: All lanes closed.
- WarningclosureIdahoUpdated August 26, 2026
Middleton Rd full closure
July 13, 2026 – September 11, 2026
Closed to Traffic on Middleton Rd Southbound near US-20. All lanes closed. Location: Middleton Rd, South. Lanes affected: All lanes closed.
- WarningclosureIdahoUpdated August 26, 2026
I-90 Westbound full closure
Since July 1, 2026
Ramp restriction on ramp from I-90 Westbound to N Ramsey Rd. All lanes closed. 7/1/2026 10:55 AM PT Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Location: I-90 Westbound. Lanes affected: All lanes closed.
- Warningstop changeIdahoUpdated August 5, 2026
BYU-Idaho stop temporarily relocated
Since June 16, 2026
Starting June 16, 2026, sidewalk construction on the BYU-Idaho campus requires a temporary stop relocation. Board at the temporary stop shown on the map until construction wraps up, and allow a few extra minutes to find it.
- WarningconstructionIdahoUpdated August 28, 2026
I-90 Eastbound roadwork
June 15, 2026 – September 8, 2026
Major Road construction on ramp from I-90 Eastbound to I-90-BL. 6/15/2026 3:28 PM PT to 9/8/2026 5:00 PM PT Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Location: I-90 Eastbound.
- WarningclosureIdahoUpdated August 26, 2026
E 40th St full closure
May 14, 2026 – October 30, 2026
Water main work on E 40th St Both Directions near US-20. All lanes closed. 5/14/2026 8:00 AM to 10/30/2026 5:00 PM Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Activities: Use Caution. Location: E 40th St, Both. Lanes affected: All lanes closed.
- WarningconstructionIdahoUpdated August 26, 2026
I-90 roadwork
March 2, 2026 – November 2, 2026
Major Bridge construction on I-90 Eastbound from MM (39) to MM (41). 1 Left lane closed. 3/2/2026 7:00 AM to 11/2/2026 6:00 PM Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Width Restriction: 12ft 6in Speed Restriction: 45mph Activities: Mandatory Speed Limit in Force. Location: I-90, East. Lanes affected: 1 Left lane closed.
- WarningconstructionIdahoUpdated August 26, 2026
I-90 roadwork
March 2, 2026 – November 2, 2026
Major Bridge construction on I-90 Westbound from MM (39) to MM (41). 1 Right lane closed. 3/2/2026 7:00 AM to 11/2/2026 6:00 PM Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Width Restriction: 12ft 6in Length Restriction: 110ft Speed Restriction: 45mph Activities: Mandatory Speed Limit in Force. Location: I-90, West. Lanes affected: 1 Right lane closed.
- WarningclosureIdahoUpdated August 31, 2026
S Kimball Ave full closure
February 2, 2026 – September 18, 2026
Bridge construction on S Kimball Ave Both Directions from I-84-BL Westbound to Arthur St. All lanes closed. 2/2/2026 7:00 AM MT to 9/18/2026 5:00 PM MT Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Activities: Consider Alternative Route, Look Out for Flagger. Location: S Kimball Ave, Both. Lanes affected: All lanes closed.
- WarningconstructionIdahoUpdated August 26, 2026
I-84 roadwork
October 27, 2024 – November 16, 2026
Major Road construction on I-84 Westbound from MM (168) to MM (165). All Lanes Intermittent. 10/27/2024 7:00 PM to 11/16/2026 7:00 PM Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Width Restriction: 22ft Speed Restriction: 65mph Activities: Use Caution. Location: I-84, West. Lanes affected: All Lanes Intermittent.
- WarningconstructionIdahoUpdated August 26, 2026
I-84 roadwork
February 28, 2024 – December 23, 2026
Major Road construction on I-84 Both Directions near MM (210). 2/28/2024 6:00 AM to 12/23/2026 7:00 PM Mon, Tue, Wed, Thu, Fri: 7:00 AM - 7:00 PM, Sat, Sun: Paused all day Width Restriction: 14ft 0in Speed Restriction: 65mph Activities: Use Caution, Warning. Location: I-84, Both.
- WarningconstructionIdahoUpdated August 26, 2026
I-84 roadwork
November 3, 2023 – May 27, 2027
Major Long term road construction on I-84 Both Directions from Centennial IC to Franklin IC. All Lanes Affected. 11/3/2023 2:45 PM to 5/27/2027 6:00 PM Mon, Tue, Wed, Thu, Fri: 12:00 AM - 6:00 AM, 10:00 PM - 12:00 AM, Sat, Sun: Paused all day Width Restriction: 24ft Speed Restriction: 55mph Activities: Look Out for Flagger, Use Caution. Location: I-84, Both. Lanes affected: All Lanes Affected.
- WarningconstructionIdahoUpdated August 26, 2026
I-84 roadwork
July 27, 2023 – November 20, 2026
Major Road construction on I-84 Westbound from MM (173) to MM (168). All Lanes Intermittent. 7/27/2023 7:00 AM to 11/20/2026 7:00 PM Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Speed Restriction: 70mph Activities: Use Caution. Location: I-84, West. Lanes affected: All Lanes Intermittent.
- AdvisoryconstructionUtahUpdated August 26, 2026
I-80 Jeremy Ranch Bridge Reconstruction
August 2, 2026 – August 30, 2027
TRAFFIC ALERT Bridge construction is paused for approximately one month as utilities are relocated. During this time, traffic control will be removed, all lanes on Homestead Road will be open, and the existing trail will remain accessible. PROJECT OVERVIEW The Utah Department of Transportation (UDOT) is replacing two bridges on Interstate 80 (I-80) at the Jeremy Ranch interchange in Summit County. This project will ensure safer, smoother travel for decades to come with long-term safety improvements to both bridges. What to Expect: Lane closures on Homestead Road Day work Monday through Friday from 7 a.m. to 5 p.m. with night work as needed Homestead Trail shifted to the road Trucks entering and exiting the work zone Increased noise, dust, and vibration in the project area Location: Westbound and eastbound I-80 at Jeremy Ranch..
- AdvisoryconstructionUtahUpdated August 26, 2026
US-89; Washington Boulevard Road Preservation
June 21, 2026 – October 1, 2026
BACKGROUND: The US-89/Washington Boulevard project objectives are aimed at preserving the life of the road. This paving process will help increase the longevity of the road surface and enhance motorist safety by providing a smoother driving surface. Additional work includes ADA sidewalk ramp upgrades, crack sealing, concrete joint repairs, and restriping throughout the project area. !! ALERT !! 06/22 - 10/01 | Sunday Night - Friday Morning Nighttime Impacts 8pm – 7am (June–Oct): Lane closures in place. At least one lane in each direction will remain open at all times. Motorists should expect construction activity and occasional noise. Daytime Impacts 8am – 7pm (August 31 - September): Sidewalks may be closed at times with pedestrian detours provided. ADA upgrades will occur during daytime hours to maintain safe pedestrian access & reduce nighttime traffic impacts. *Contact dedicated…
- AdvisoryconstructionUtahUpdated August 26, 2026
US 89 Orton to Circleville
May 17, 2026 – November 29, 2026
The Utah Department of Transportation (UDOT) has begun improvements from the US-89 and SR-20 intersection to Circleville Canyon - approximately ten miles - as of May 18, 2026. These improvements will be finished in August 2026. There will be one lane in each direction from approximately 7 a.m. to 7 p.m., Monday through Friday. Motorists can expect up to 15-minute delays in each direction. Location: US-89 and SR-20 to Circleville Canyon.
- AdvisoryconstructionUtahUpdated August 26, 2026
US-89 / US-91 RCUT – Wellsville Center Street – Safety Project
May 3, 2026 – October 19, 2026
TRAFFIC ALERT!! | The US-89/91 Wellsville RCUT will begin operating in its full traffic pattern Wednesday, August 19, 2026 | Both right and left turns are allowed from Center Street and SR-23 at US-89/91 | It does not change any movements that are possible from US-89/91, and main highway traffic flows freely | Drivers from SR-23 or Center Street must turn right onto US-89/91 and proceed to a designated U-turn location and make a U-turn to continue in the desired direction | Follow posted traffic control. There will be lane shifts in place to accommodate work zones. -- TRAFFIC ALERT!! | Expect shifted, narrowed, or closed lanes northbound and southbound daily from 6:00 AM until 2:00 PM. | Speed limit reduced to 55 mph through the work zone | Please plan extra travel time and use caution when driving through the project area. * Description: UDOT is improving the safety of the…
- AdvisoryconstructionUtahUpdated August 27, 2026
SR-36 & I-80 Improved - EB I-80
April 22, 2026 – September 10, 2026
TRAFFIC ALERTS All lanes are currently open on SR-36 & I-80. Drivers can expect occasional temporary lane closures mid-September. PROJECT OVERVIEW The Utah Department of Transportation (UDOT) has active construction on northbound State Route (SR) 36 between Interstate 80 (I-80) and Stansbury Parkway in Tooele County. This project will widen, improve, and resurface the intersections and add an auxiliary lane to eastbound I-80 from SR-36 to the SR-201 exit. Construction is anticipated to continue through fall 2026. Location: Eastbound I-80 between the SR-36 and SR-201 exit..
- AdvisoryconstructionUtahUpdated August 27, 2026
I-15 – 9000 S to 10600 S – Reconstruction
April 5, 2026 – October 29, 2026
The northbound I-15 off-ramp at 9000 South will be closed during overnight work hours (9 p.m. to 5 a.m.) as early as Tuesday, September 1, for two nights to facilitate pavement repairs. Northbound motorists wishing to access 9000 South will continue north on I-15 to 7200 South, exit, and return southbound on I-15 to access 9000 South. Motorists should expect minor delays and plan additional travel time. --------------------------------------------------------- This project will include roadway concrete repairs, evaluation and replacement of pedestrian ramps, removal of existing substandard signs, high-visibility striping, and pothole patching and polymer overlay at 10000 S Bridge. This project will help increase public safety, improve roadway conditions, and expand mobility. Construction is expected to begin on April 6, 2026. Location: This preservation project on I-15 takes place from…
- AdvisoryconstructionIdahoUpdated August 26, 2026
I-90 roadwork
Since March 26, 2026
Road construction on I-90 Both Directions from MM (33) to MM (25). All Lanes Intermittent. 3/26/2026 8:16 AM Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Width Restriction: 13ft Length Restriction: 100ft Speed Restriction: 45mph Location: I-90, Both. Lanes affected: All Lanes Intermittent.
- AdvisoryconstructionIdahoUpdated August 26, 2026
I-15 roadwork
March 2, 2026 – October 31, 2026
Long term road construction on I-15 Both Directions from Inkom to Portneuf River. 3/2/2026 7:00 PM to 10/31/2026 7:00 PM Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Width Restriction: 12ft Location: I-15, Both.
- AdvisoryconstructionUtahUpdated August 26, 2026
I-15 Springville/Spanish Fork Interchange
September 28, 2025 – October 2, 2026
I-15 Springville/Spanish Fork Interchange ------------------------------------------------------ 8/24 through 9/4, 950 West closed at Dry Creek Parkway. See website for details. Location: I-15; 2700 N Spanish Fork.
- AdvisoryconstructionUtahUpdated August 29, 2026
I-84 & 4400 South Bridge Replacement
August 10, 2025 – October 30, 2026
In observance of the Labor Day holiday, our crews will pause all work on Friday, September 4. Construction will resume Tuesday, September 8. Starting 10 pm Sept 12 through 8 a.m. Sept 13, WB I-84 will be closed and & EB I-84 will remain open but reduced to a single lane. 4400 South will be closed between the roundabouts. No trucks with trailers, semi-trucks or other vehicles over 40 feet in length will be allowed on 4400 South between Cozy Dale Drive and Parker Drive during construction. A heigh limit of 13'6" is also in place. There are ongoing shoulder closures on NB and SB I-15. Location: 4400 South over I-15 & I-84 Northbound in Roy and Riverdale.
- AdvisoryconstructionUtahUpdated August 26, 2026
US-89; SR-126 to Hargis Hill Road
April 14, 2025 – November 29, 2026
ALERT: Northbound US-89 at the 2000 West (SR-126) junction will close to northbound travel from Monday, Aug. 24, to Friday, Aug. 29, for bridge work. Traffic on US-89 has been shifted and reduced to one lane in each direction while crews replace the subgrade layers, make drainage improvements, and repave the road. Travel lanes between Saddleback Road and 300 North have been shifted to the east side of the road. 750 N: Because of the width restrictions and lane configurations, we encourage oversized truck loads traveling on 750 N to continue straight onto I-15 and call our project hotline (435) 280-8090 to accommodate restrictions. DESCRIPTION: UDOT will construct improvements along US-89 from the US-89/SR-126 intersection to just south of Hargis Hill Road in Willard. These improvements will replace subgrade material (e.g., compacted gravel) and pavement which has reached its operational…
- AdvisoryconstructionIdahoUpdated August 26, 2026
I-84 roadwork
January 31, 2025 – December 31, 2026
Long term road construction on I-84 Both Directions from Garrity Blvd to Ten Mile Road. 1/31/2025 1:00 PM to 12/31/2026 8:00 PM Mon, Tue, Wed, Thu, Fri: 12:00 AM - 10:00 AM, 7:00 PM - 12:00 AM, Sat, Sun: Paused all day Location: I-84, Both.
- AdvisoryconstructionIdahoUpdated August 26, 2026
I-15 roadwork
December 3, 2024 – June 1, 2027
Long term road construction on I-15 from MM (77) to MM (80). 12/3/2024 7:13 AM to 6/1/2027 6:00 PM Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Width Restriction: 25ft Speed Restriction: 65mph Activities: Mandatory Speed Limit in Force, Use Caution. Location: I-15.
- AdvisoryconstructionIdahoUpdated August 26, 2026
I-84 roadwork
June 12, 2024 – November 20, 2026
Road construction on I-84 Both Directions from MM (168) to MM (173). All Lanes Intermittent. 6/12/2024 8:52 AM to 11/20/2026 7:00 PM Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Speed Restriction: 70mph Activities: Expect Delays, Use Caution. Location: I-84, Both. Lanes affected: All Lanes Intermittent.
- AdvisoryconstructionUtahUpdated August 26, 2026
I-15 Shepard Lane Interchange Improved
March 3, 2024 – December 30, 2026
I-15 Shepard Lane Interchange Improved --- NB & SB I-15 Overnight Lane Closures – Up to three lanes on NB and SB I-15 will close nightly 8/24 through 8/28 between North Station Lane in Farmington and Parrish Lane in Centerville for bridge work. Lanes close at 9 p.m. each night and open by 7 a.m. --- SB Legacy Parkway Overnight On-Ramp Closure – The SB Legacy Parkway on-ramp at the Park Lane interchange in Farmington will close as early as 10 p.m. 8/27, through 6 a.m. 8/28, for pedestrian bridge work. Detour to Parrish Lane via I-15 in Centerville to access SB Legacy Parkway. --- New Interchange Open – North Station Lane interchange opened on Monday, June 29. All on- and off-ramps are open except the SB I-15 on-ramp, which is closed until further notice while crews work to improve the merge onto I-15. --- TRAFFIC SHIFT – Northbound and southbound I-15 travel lanes between Burton Lane in…
- AdvisoryconstructionIdahoUpdated August 26, 2026
I-84 roadwork
July 27, 2023 – November 20, 2026
Road construction on I-84 Eastbound from MM (165) to MM (168). All Lanes Intermittent. 7/27/2023 7:00 AM to 11/20/2026 7:00 PM Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Width Restriction: 22ft Speed Restriction: 65mph Activities: Use Caution. Location: I-84, East. Lanes affected: All Lanes Intermittent.
- InfoconstructionIdahoUpdated August 5, 2026
Idaho road construction may affect travel times
Since June 11, 2026
Idaho Transportation Department projects along I-15 and US-20 may add delays this season. Check current conditions before you travel.
- InfoconstructionUtahUpdated August 5, 2026
Utah road construction may affect travel times
Since June 2, 2026
Several UDOT construction projects along our Utah corridors may add delays. Check current conditions before you travel.
- InfoconstructionNevadaCaliforniaMontanaUpdated August 5, 2026
Nevada, California, and Montana road projects
Since May 23, 2026
State DOT construction in Nevada, California, and Montana may affect select routes. Check each state's 511 site for current conditions.